Based in Greenville, SC · Data Centers & Electronics · Energy & Resources864.520.9966solutions@assure-cx.com
Assure-Cx - Independent Commissioning and Turnover Assurance
Choose the operating environment

One commissioning brand. Two focused industry paths.

Assure-Cx now routes visitors to the site experience that best matches their facility: Data Centers & Electronics or Energy & Resources. Both are built around independent commissioning, startup readiness, turnover assurance, and Operational Rhythm.

Data Centers & Electronics

Ready for load, turnover, and day-one operations.

Independent commissioning and operational-readiness support for data centers, electronics facilities, critical power, cooling, controls, white space, grey space, and live-site upgrades.

L0–L6 commissioning and ISTElectrical, mechanical, controls, BMS, EPMS, DCIMAI/HPC, liquid cooling, live-site, and turnover support
Enter Data Centers & Electronics
Energy & Resources

Ready for startup, hydrocarbons, and safe operations.

Commissioning, startup-readiness, controls, turnover, and operational assurance for oil and gas, LNG, midstream, terminals, utilities, and complex process infrastructure.

Mechanical completion, CSU, and turnover systemsI&C, electrical, fire & gas, SIS/ESD, DCS/PLC/SCADALNG, gas treatment, compression, pipelines, and terminals
Enter Energy & Resources
Assure-Cx positioning

Independent commissioning and turnover assurance where failure is not an acceptable outcome.

The website is structured as a two-in-one platform. Each industry path speaks the language of its buyers, but both connect back to the same core promise: disciplined verification, clean evidence, faster turnover, and operating teams that receive systems they can actually run.

1

Verify design intent

Translate owner requirements into acceptance criteria, scripts, schedules, and turnover requirements.

2

Control readiness risk

Track gaps, owners, dates, test evidence, blockers, interfaces, and escalation paths.

3

Prove integrated operation

Test systems, people, alarms, procedures, failure response, restart, and recovery.

4

Hand over operational rhythm

Leave behind evidence, standards, dashboards, procedures, training, and lessons learned.

Need help choosing the right path?

Send the phase, facility type, systems in scope, and current turnover risk. Assure-Cx will shape the first readiness review around the environment that matters most.

Email solutions@assure-cx.com