Strategy & requirements
Owner requirements, commissioning scope, execution plan, levels, roles, acceptance criteria, and reporting cadence.
Assure-Cx structures the commissioning path around planning, factory verification, field verification, functional testing, integrated systems testing, facility acceptance, and post-turnover support.
Owner requirements, commissioning scope, execution plan, levels, roles, acceptance criteria, and reporting cadence.
Submittals, FAT/SAT, vendor documentation, factory issues, equipment acceptance, and site delivery readiness.
Installation verification, pre-functional checklists, QA/QC observations, punch control, and system readiness.
Equipment and subsystem functional tests, sequence validation, alarms, control loops, setpoints, and safeties.
Power/cooling/control integration, failure modes, transfer schemes, restart, recovery, and operational response.
Load-bank coordination, demonstrations, training, acceptance, seasonal checks, lessons learned, and warranty-period support.
Assure-Cx uses scenarios that confirm systems, operators, controls, alarms, vendors, and documentation can work together under credible operating conditions.
Generator start, transfer, load acceptance, UPS ride-through, EPMS event capture, and recovery.
Chiller/pump failures, CRAH response, valve/fan control, water-side stability, and thermal trends.
BMS/DCIM/EPMS alarms, comms loss, manual operation, local override, and operator escalation.
Method-of-procedure review, isolation, rollback, contingency, and operations coordination.