Based in Greenville, SC · Data Centers & Electronics · Energy & Resources864.520.9966solutions@assure-cx.com
Energy & Resources Services

Commissioning, startup-readiness, controls, safety, and turnover support.

Services are organized for process infrastructure where mechanical completion, controls verification, startup planning, and operations handover must be tightly connected.

01

Commissioning strategy

Systemization, execution plans, priority systems, boundary drawings, readiness gates, commissioning schedules, interface matrices, and reporting cadence.

02

Mechanical completion support

MC packages, punch categorization, walkdowns, preservation checks, test pack status, reinstatement readiness, and turnover sequencing.

03

Pre-commissioning

Loop checks, calibration status, continuity checks, motor bump support, vendor checkout, flushing/blowing coordination, utility readiness, and function checks.

04

Controls and automation

DCS/PLC/SCADA, HMI, alarms, trends, logic checks, cause-and-effect, control narratives, network/OT handover, and historian reporting alignment.

05

Safety-critical verification

SIS, ESD, F&G, BMS, interlocks, hazardous-area interfaces, proof-test planning, alarm response, and emergency scenario drills.

06

Operations turnover

Turnover dossiers, procedures, training, spares, warranties, asset data, open punch, temporary systems, startup constraints, and lessons learned.

Engagement types

Scoped for advisory, field execution, rescue, or staff augmentation.

EngagementTypical needAssure-Cx support
CSU readiness reviewProject is nearing startup but lacks clear status, ownership, or risk visibility.Readiness gap assessment, issue prioritization, system status, dashboard, action plan, and owner reporting.
I&C commissioning supportControls, instruments, loops, logic, alarms, and interfaces are creating startup risk.Loop check strategy, functional validation, DCS/PLC/SCADA witness, C&E checks, alarm review, and evidence control.
Turnover rescueDocumentation, MC packages, punch, redlines, and operations acceptance are lagging the schedule.Dossier matrix, closeout workflow, field verification, punch governance, and turnover acceptance packages.
Seconded commissioning resourcesOwner, EPC, or operator needs experienced project support without long-term headcount.Commissioning managers, discipline leads, I&C specialists, field engineers, and partner-supported technicians.